FIRST MATE OF A FOREIGN GOING SHIP (PHASE-II)
FUNCTION: CONTROLLING THE OPERATION OF THE SHIP AND CARE
FOR PERSONS ON BOARD
PAPER: NAVAL ARCHITECTURE PAPER-II
TIME: 3HOURS PASS MARKS: 100 MAX.MARKS:200
NOTES:
1. Question No. 1,2,3&4 are compulsory. Attempt any FOUR From the remaining
Questions.
2. All question carry equal marks.
3. Wherever applicable sketches should be drawn to support the answer
Q1 M.V. Hindship in DW of RD 1.010 is at a draft of F: 7.5m, A:8.5m. Calculate the total
Quantity of cargo to be loaded and its location with respect to AP so that when in SW she is
A her winter load line and also trimmed by 0.5 by stern.
Q2 A box shaped vessel of dimensions 150×25×8m is floating in water of RD 1.010 at even
Load draft of 6m.. KG 10m, and FSM 1100 tm. A compartment on the starboard side of
Gfhgjkh 30×10×8m, is filled with cargo of permeability 55% calculate the list if this
Comparunbent is bilged.
Q3 A transverse bulkhead consists of a rectangle of breadth 18m and height 12m and below it
An isoseasles triangle of breadth 18m and height 9m if the adjacent tank is filled with oil of
Rdoo to a head of 3m calculate the thrust and COP of the bulkhead.
Q4 Sketch the midship section of membrane type LNG carrier.
Q5 Explain the purpose of inclining test and state the precautions that should be taken during this
Lest
Q6 Write short notes on the following:-
(a) stil and tender ship (b) Shift of C.G. due to loading of heavy lift by ship’s crane
(c) A-60class division (d) sprinkler type fixed fire extinguishing system
Q7 (a) Explain the creation sequence in shipyard practice in ship construction
(b) Describe the use of computers in ship building.
Q8 Describe the checks which will be carrier out during the load line survey.
Q9 Describe the tests carried out on steel used for ship construction.
***************************