FIRST MATE OF A FG(PHASE-II) NAVAL ARCHITECTURE PAPER-II

FIRST MATE OF A FG(PHASE-II) NAVAL ARCHITECTURE PAPER-II

by Administrator 12. July 2010 13:49
 

 

                FIRST MATE OF A FOREIGN GOING SHIP (PHASE-II)

FUNCTION: CONTROLLING THE OPERATION OF THE SHIP AND CARE

                                    FOR PERSONS ON BOARD

                   PAPER: NAVAL ARCHITECTURE PAPER-II

TIME: 3HOURS                        PASS MARKS: 100                       MAX.MARKS:200

NOTES:

1.      Question No. 1,2,3&4 are compulsory. Attempt any FOUR From the remaining

Questions.

2.      All question carry equal marks.

        3.    Wherever applicable sketches should be drawn to support the answer

 

Q1 M.V. Hindship in DW of RD 1.010 is at a draft of F: 7.5m, A:8.5m. Calculate the total

      Quantity of cargo to be loaded and its location with respect to AP so that when in SW she is

      A her winter load line and also trimmed by 0.5 by stern.

Q2 A box shaped vessel of dimensions 150×25×8m is floating in water of RD 1.010 at even

       Load draft of 6m.. KG 10m, and FSM 1100 tm. A compartment on the starboard side of

      Gfhgjkh 30×10×8m, is filled with cargo of permeability 55% calculate the list if this

      Comparunbent is bilged.

Q3 A transverse bulkhead consists of a rectangle of breadth 18m and height 12m and below it

       An isoseasles  triangle of breadth 18m and height 9m if the adjacent tank is filled with oil of

       Rdoo to a head of 3m calculate the thrust and COP of the bulkhead.

Q4 Sketch the midship section of membrane type LNG carrier.

Q5 Explain the purpose of inclining test and state the precautions that should be taken during this

        Lest

Q6 Write short notes on the following:-

   (a)  stil  and tender ship    (b) Shift of C.G. due to loading of heavy lift by ship’s crane

   (c) A-60class division         (d) sprinkler type fixed fire extinguishing system

Q7 (a) Explain the creation sequence in shipyard practice in ship construction

       (b) Describe the use of computers in ship building.

Q8 Describe the checks which will be carrier out during the load line survey.

Q9 Describe the tests carried out on steel used for ship construction.

                                                                    ***************************

      

 

 

 

          

 

 

 

 

 



Tags:

Previous Questions

Powered by Shipping Tutorials 1.5.0.7

Announcement / Contest

Please send your on board experiences, shippingbased articles and previous years question papers to us . Now "Fragrance " our Newletter will be published in every four month in print. For advertisement contact us at shippingtutorials@gmail.com  Smile

Announcement-2

  • Writersadda requires Articles for the monthly E-Zine “Fragrance” 

    Rules:-
    1. You need to be a member of Writersadda.com
    2. The articles will be chosen every month and will get published in the monthly E-Zine “Fragrance”.
    3. The blogs, travelogues, short stories, fiction, short novels, pages from your diary, shipping related articles , onboard experiences etc will be of minimum 700 words. And poetry blogs will have at least 3 stanzas .
    4. You can post as many entries as you can .
    5. This E-zine is getting published online and getting distributed to all the clients of Swayam Maritime  
        Academy.
    6. We will publish the compiled version in print at the end of the year, 2011.

    If you want to buy the above magazine pls contact us.